When collecting our material, we adhere to the most rigorous of criteria. Our Production Manager issues raw material requisition to purchasing based on approved samples and drawings, and agreed quantities. Samples are shown to consultants for approval and, if approved, samples are forwarded to Purchasing. Any material that is below our required standards is rejected, with only selected materials being packed and shipped to the U.A.E.

© 2024 Al Marge. All Rights Reserved Designed by Dotline